Iran-Water Resources Research

Iran-Water Resources Research

A Review on Estimation Methods for Suspended Load Case study: Seydon Basin, Iran

Document Type : Original Article

Authors
1 Ghods Niroo Engineering Company, # 98, Motahari St., Tehran, Iran.
2 - Ghods Niroo Engineering Company, # 98, Motahari St., Tehran, Iran.
3 Soil Conservation and Watershed Management Research Institute (SCWMRI), Karadj, Iran
Abstract
Suspended load in water are a problem dam reservoir management. Accordingly a pre-construction study on suspended load is needed for dams and other hydraulic structures. There are several methods all of which need the results from the field sampling from the river under study or the conjunctive rivers. Because of limited data, interpolation and/or extrapolation will normally be necessary.
In this research, regarding the absence of gauges on SeydonRiver, data from other stations in the basin were used. The result was used on the area-ratio basis. This study was done using single line Sediment Duration Curve (SDC), double line and seasonal SDC, and, FAO methods. The result are then compared to the PESIAC method resulted in the selection of the best method for study area.
Keywords

میرابوالقاسمی، هادی. و مرید، سعید. (1374) بررسی روشهای هیدرولوژیکی برآورد بار معلق رودخانه‌ها، مجله آب و تکنولوژی. شماره 3، سال سوم، ص 54-67.
میرابوالقاسمی، هادی (1373) ارزیابی روش USBR در برآورد بار معلق رودخانه کارون ، سمینار مهندسی رودخانه اهواز.
Jones, K. R., et al. (1981), paper 37: Arid Zone Hydrology, FAO, Rome.
USBR (1987) "Design of Small Dams, Water Resources Technical Publication.
Walling. D.E. (1985), "Development in Erosion yield studies" UNESCO, Paris.
Volume 3, Issue 3
Spring 2008
Pages 73-75

  • Receive Date 15 November 2006
  • Revise Date 23 January 2008
  • Accept Date 18 March 2008